Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
How many times can I apply for a permit extension?
A permit is valid for two years from the time the permit fees are paid. Each permit extension is good for 6-month within the two years limit.
How many units will be required to comply with DA?
For elevator buildings, all units on floors served by the elevator must be accessible. For non-elevator buildings, all ground floor units must be accessible.
How many wheelchair spaces are required in assembly areas?
For example: An assembly area of fixed seats between 51-150 seats, there shall be four accessible spaces, per the Table.
How much are non-compliance fees?
Fees are $550.00 for failure to comply within 15 days of the compliance date.
How much does it cost to have a report reviewed by the Grading Division?
Please refer to Department fee schedule online for general fees. Final fees to be determined at the time of submittal.
How much do I have to pay for my appeal?
The fee is based on the nature of the appeal and the number of the appealed items. See the Information Bulletin P/ZC 2023-019 for more information.
How much do I pay for a Permit extension?
The inspector assigned to your project can explain the required fees for a permit extension.
How much do I pay to extend my Plan Check time?
The Plan Check staff assigned to your project can explain the required fees for the plan check extension for your project.
How much is the permit fee?
The fee is calculated in accordance to code section 93.0213. Each electrical component is itemized as a fee item. You may calculate the fee on our website using the Permit Fee Calculator.
How much is the plan check fee?
Plan check fee is 80% of the permit fee, not including the energy fee or other administrative fees. The fee is calculated in accordance to code section 93.0213. Each electrical component is itemized as a fee item. You may calculate the fee on our website using the Permit Fee Calculator.
Filtered categories:
Filtered categories: