Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
Does the listing mark or logo on an electrical product satisfy approval of installed product?
In general yes; however, if fraudulent, counterfeited, or non-applicable listing mark or logo is used on the electrical products, or if the installer misapply or use the product for other than its intended purpose, or if the installer does not follow the installation instructions of the product, the Department would treat them as an unlisted electrical product, and will notify the testing agency of the problem. The installer will be required to resolve the matter with the listing agency, or submit the product to City of Los Angeles Electrical Test Lab for evaluation and approval or any other recognized testing agency, or remove the product.
Does the manager's unit need to comply with DA requirements?
Yes, the manager's unit needs to comply with the same DA requirements as the dwelling unit.
Does the Metro office have the same records as the Van Nuys location?
Yes. Records may also be obtained from Online Building Records.
Does the number of stories of a building affect the designation of a building from a residential to a non-residential project?
No, the number of stories does not change the requirements of a residential or non-residential use.
Do I have to install a hood in a residential kitchen?
A hood is not required for residential kitchens. However, it is required to provide kitchen ventilation for removing moisture.
Do I have to pay for a Certificate of Occupancy?
The fees are a part of the inspection fees.
Do I have to pay for an appeal if the error is an LADBS error?
If you can show that the Department has erred and LADBS accepts the error, LADBS will correct the error. Otherwise, you will need to pay a required fee to file an appeal against LADBS' determination.
Do I have to return to plan check for all changes?
Minor changes usually do not require returning to plan check. All major or structural changes require you to return to plan check.
Do I have to return to the plan checker who reviewed my plans for corrections?
No, but it would be more helpful if the plan checker was the original one who granted approval.
Do I have to schedule a different inspection for each division?
Yes. Each division has their own permit.
Filtered categories:
Filtered categories: