Electrical Test Lab (ETL)
The ETL evaluates electrical equipment for safety, fire and shock hazards and personnel injuries in accordance with the current applicable codes and standards. Approved materials are published as Los Angeles Research Reports (LARR).
Contact the
ETL
Electrical Testing Laboratory
Address: 221 N. Figueroa St. Room 500, Los Angeles, CA 90012
Telephone: (213) 482-6721 Fax: (213) 482-6554
Email: LADBS-ElectricalTestLab@lacity.org
Engineer: Miko Ghazaian
Email: miko.ghazaian@lacity.org Telephone: (818) 374-9998
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- FAQ
- Forms & Applications
- Publication & Rosters
FAQ Search Results
Filtered categories:
All
Exceptions for products without proper approval are considered by the Structural Plan Check Division. See your plan checker and plan check supervisor regarding the process and fees required for an administrative approval.
Was this helpful?
The aim of LADBS Code Enforcement is to preserve and enhance the safety, appearance and economic stability of our community through the diligent enforcement of applicable ordinances and land use regulations. It maintains Los Angeles Municipal Codes (LAMC) by issuing an Order to Comply (OTC) to the property owner and any other person in control of a property who violates or causes or permits another person to violate any provision or requirement of the LAMC.
The OTC is essentially a warning letter with a time frame for voluntary compliance. The OTC describes the violation(s), instructions to remedy the violation(s) and warnings of possible penalty fees and criminal prosecution. Violation of the LAMC is a misdemeanor and code enforcement cases must therefore be prepared for the possibility of being resolved in Los Angeles Superior Court.
Read more about LADBS Code Enforcement.
Was this helpful?
“ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies”
requires the following items as part of Retro-Commissioning:
- Define Owner’s EBCx goals and objectives.
- Select the Initial EBCx Team.
- Collect and analyze historical energy use.
- Study the building and its operational characteristics with regard to energy use, occupant health and productivity, and equipment and structural reliability and longevity.
- Develop CFR
- Review building documentation such as building plans, specifications, O&M manuals, and maintenance records.
- Perform diagnostic monitoring and establish trend logs to documents building performance for several weeks.
- Visually inspect systems for correct installation and operation.
- Perform simple repairs required to keep equipment operating, reduce energy use, and allow more accurate data gathering such as trend logging.
- Perform functional tests.
- Identify potential modifications that will reduce energy use and/or cost (includes a descriptions of the measure, estimated energy savings, cost estimate, and simple payback).
- Perform an engineering and economic analysis of potential modifications.
- Prepare a rank-ordered list of appropriate modifications.
- Implement recommended modifications.
- Prepare the draft EBCx Report, which includes the Implementation Report.
- Revise O&M procedures to improve efficiency and equipment longevity.
- Update facility personnel training programs for current and revised systems. Implement retraining of O&M staff as required.
- Transition to Ongoing Commissioning (OCx) with the OCx Plan. Ensure persistence of benefits with measurement and verification (M&V) strategies such as trend logging and monitoring.
- Prepare the final EBCx Report, including the Lessons Learned Report.
Definitions:
CFR: Current Facility Requirements
EBCx: Existing-Building Commissioning
M&V: Measurement and Verification
OCx: Ongoing Commissioning
O&M: Operation and Maintenance
Was this helpful?
”ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies” requires the following items as part of the Audit:
- Convene kick-off meeting to form team. Develop a procedural plan.
- Collect and analyze historical energy use.
- Study the building and its operational characteristics with regard to energy use.
- Identify potential modifications that will reduce energy use and/or cost (includes a description of the measure, estimated energy savings, cost estimate, and simple payback).
- Perform an engineering and economic analysis of potential modifications.
- Prepare a rank-ordered list of appropriate modifications.
- Prepare a report to document the analysis process and results.
Was this helpful?
The BBSC consists of five citizens appointed by the Mayor and confirmed by the City Council. The BBSC is granted the authority, by the Los Angeles Municipal Code (LAMC) and by the City Charter, to hear many kinds of appeals related to Building ordinances.
Read more about the BBSC.
Was this helpful?
Please refer to LADWP Pacific Palisades Undergrounding Initiative, which provides more information, along with the requirements and steps for electric service installation. If you have any questions or concerns, please reach out to LADWP.
Was this helpful?
Once you have your plans ready for submittal, you can submit them through our Eplan portal using the address '1 Standard Plan Way'. Please include in the work description, 'ADU Standard Plan Program: X-Story, X-bedroom(s) with options. (XXX sf)'. You will need to submit plans for each unit you are proposing.
Was this helpful?
Once you have your plans ready for submittal, you can submit them through our Eplan portal using the address ‘1 Standard Plan Way’. Please include in the work description, SFH or ADU or MISC ‘Standard Plan Program: X-Story, X-bedroom(s) with options. (XXX sf)’. You will need to submit plans for each unit you are proposing.
Was this helpful?
The evaluation time frame is based on the complexity of the product. Contact the Engineering Research Section for the current status. The process to obtain a Los Angeles City Research Report consists of the following steps:
- Determine if a LARR is required or not using the Information Bulletin P/BC 2020-119.
- Submit the following information to the Los Angeles City Department of Building and Safety Engineering Research Section: product literature describing how your product is to be used, substantiating data (i.e. test reports by approved 3rd party testing agency, engineering analysis), a completed application form for new LARR, along with a check in U.S. dollars drawn on a U.S. bank.
- Once this information is received, your application package will be reviewed for completeness. If any deficiencies are determined, a letter will be sent to the applicant stating the deficiencies requiring correction or completeness.
- After determining the application package is complete, the application will be logged in and assigned a log number and placed in line for review.
- The substantiating data submitted will be evaluated to determine if it is at least the equivalent of the prescribed devise, material, or method of construction specified by the Los Angeles City Building Code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability, and safety.
- After reviewing the substantiating data, the research engineer assigned to the application will write a letter stating their comments and the information needed to complete the evaluation and/or correct the evaluation, if necessary.
- Upon resolution of all comments a draft copy of the Los Angeles City Research Report will be written. The draft copy of the Research Report will be e-mailed to the applicant for their review and comment. In addition, a supplemental fee will be sent to the applicant to bill the additional reviewing hours for the report approval beyond the first 6 hours.
- After all comments from the applicant have been resolved and the supplemental fee has been paid by the applicant, the Research Report will be submitted to the Chief of the Engineering Research Section for final review and approval. A signed copy of the Los Angeles City Research Report will be mailed to the applicant and a copy will be posted on the LADBS web site.
Was this helpful?
The evaluation time frame is based on the complexity of the product. Contact the Building Research Section for the current status.
The process to obtain a Los Angeles City Research Report consists of the following steps:
- Determine if a LARR is required or not, using the Information Bulletin P/BC 2020-119
- Submit the following information to the Los Angeles City Department of Building and Safety Building Research Section:
- Product literature describing how your product is to be used
- Substantiating data (i.e. test reports by approved 3rd party testing agency, engineering analysis)
- A completed application form for new LARR (PC-STR.App18)
- A check in U.S. dollars drawn on a U.S. bank.
- Once this information is received, your application package will be reviewed for completeness. If any deficiencies are determined, a letter will be sent to the applicant stating the deficiencies requiring correction or completeness.
- After determining the application package is complete, the application will be logged in and assigned a log number and placed in line for review.
- The substantiating data submitted will be evaluated to determine if it is at least the equivalent of the prescribed device, material, or method of construction specified by the Los Angeles City Building Code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability, and safety.
- After reviewing the substantiating data, the research engineer assigned to the application will write a letter stating their comments and the information needed to complete the evaluation, if necessary.
- Upon resolution of all comments, a draft copy of the Los Angeles City Research Report will be written. The draft copy of the Research Report will be e-mailed to the applicant for their review and comments. In addition, a supplemental fee will be sent to the applicant to bill the additional reviewing hours for the report approval beyond the first 6 hours.
- After all comments from the applicant have been resolved and the supplemental fee has been paid by the applicant, the Research Report will be submitted to the Chief of the Building Research Section for final review and approval. A signed copy of the Los Angeles City Research Report will be mailed to the applicant and will also be posted on the LADBS website under "LA Research Reports".