Electrical Test Lab (ETL)
The ETL evaluates electrical equipment for safety, fire and shock hazards and personnel injuries in accordance with the current applicable codes and standards. Approved materials are published as Los Angeles Research Reports (LARR).
Contact the
ETL
Electrical Testing Laboratory
Address: 221 N. Figueroa St. Room 500, Los Angeles, CA 90012
Telephone: (213) 482-6721 Fax: (213) 482-6554
Engineer: Antonio Maldonado
Email: antonio.maldonado@lacity.org Telephone: (213) 482-7382
Engineer: Isaac Almaraz
Email: isaac.almaraz@lacity.org Telephone: (213) 482-0035
Engineer: Stephanie Lopez
Email: stephanie.j.lopez@lacity.org Telephone: (213) 482-0068
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- FAQ
- Forms & Applications
- Publication & Rosters
FAQ Search Results
Filtered categories:
All
If it is a building code issue, you may file a request for modification. Please refer to the Request for Modification (Mod.00) form for reference. In approving such a request, the Department needs to determine that the slight modification is reasonably equivalent to the ordinance requirement involved, that a special individual reason makes the strict letter of the ordinance impractical, and that the slight modification is in conformity with the spirit and purpose of the Code involved.
If the request is denied by the Department, it may be appealed to the Board of Building and Safety Commissioners.
If it is a Planning Code issue, this Department can only review and act on items stipulated in Section 12.26, specifically, yard variances not exceeding 20% of the required yard and parking facility design as published in Sec. 12.21A5. (Reprint from Planning Code Section 12.26). All other request for changes from the Planning Code shall be filed with the Planning Department.
Was this helpful?
You need to file for a Clerical Modification approval. You need to perform the following steps:
- Submit a completed Clerical Modification application form (PC-STR-App.19). Original signature is required.
- Submit the application fee as marked on the application form. Make check payable to “The Department of Building and Safety, City of Los Angeles.”
Was this helpful?
Addition of a model to an existing approval requires submittal of Technical Modification. You need to perform the following steps:
- Submit a completed Technical Modification application form (PC-ELEC-App.12). Original signature is required.
- Submit the application fee as marked on the application form. Make check payable to “The Department of Building and Safety, City of Los Angeles.”
- Submit a current production sample of the new equipment model. d. Provide a current new model product literature (brochure, operational instruction, maintenance manual, owner’s manual).
- Photographs or drawings showing the exterior views and internal views of the new equipment.
- Schematic wiring diagrams. Diagrams should identify the sizes of wires, ratings of fuses, circuit breakers, and other components.
- The parts list for the components operating at or above 30 VAC or 24.8 VDC in dry locations or 15 VAC or 12.4 VDC in wet locations. Include the part's function, name of manufacturer, catalog number, electrical ratings, and testing agency component recognition or listing number.
- For new model with unlisted transformers, drivers or power supplies with a rating of less than 1KVA, provide two samples with schematic wiring diagrams and specification sheets.
Was this helpful?
The steps are the same as regular approval, as follows:
Submit the following:
- A completed application form (PC-ELEC-App.12). Original signature is required.
- Application fee as marked on application form. Make check payable to “The Department of Building and Safety, City of Los Angeles.”
- Current product literature (brochure, operational instruction, maintenance manual, owner’s manual).
- Photographs or drawings showing the exterior views and internal views of the equipment.
- Schematic wiring diagrams. Diagrams should identify the sizes of wires, ratings of fuses, circuit breakers, and other components.
- The parts list for the components operating at or above 30 VAC or 24.8 VDC in dry locations or 15 VAC or 12.4 VDC in wet locations. Include the part's function, name of manufacturer, catalog number, electrical ratings, and testing agency component recognition or listing number.
- Production sample of the equipment as follows:
- For General or Laboratory Approval: Submit a current production sample (complete and operable) with all appurtenances to operate the equipment. If the equipment is too heavy or large to ship to the laboratory, arrange for a field location in the City of Los Angeles or at the factory where a complete testing can be performed without on-site restrictions (call the laboratory for a prior arrangement) and pay for the field trip charges.
- For One-Time Approval of field installed equipment: Provide the field location where the equipment is intended to be installed insuring that it can be evaluated and tested without on-site restrictions. Provide the complete address, phone number, and contact person. Pay for the field trip charges.
However, the revised approval may require a new model designation of the previous product and the approval would be for the duration that was originally established for the equipment.
Was this helpful?
Current product literature, owner’s manual, schematic wiring diagrams and parts list, installation instruction (if applicable), and a production sample of the equipment with all the options and accessories.
Was this helpful?
The permit number, address, owner, description of work, A&E occupancy load, and signature.
Was this helpful?
An approved recognized electrical testing agency is a testing agency that obtains approval from the Department of Building and Safety to perform testing and listing and field evaluation. A list of these recognized testing agencies are posted on the LADBS web as follows on the "Electrical Test Lab (ETL)" page:
- Testing agencies that have approval for listing of equipment
- Testing agencies that have approval for one-time field evaluation
Was this helpful?
All construction work for which a permit is required shall be subject to inspection by authorized inspectors. An inspection must be performed before work is concealed or covered. It is your responsibility to notify the inspector when the work is ready for inspection. Work is generally inspected and approved in succession and no work may continue beyond the point indicated in each successive inspection without first obtaining the approval of the inspector.
Common items to be inspected are foundation excavations, concrete work, wood framing, ventilation equipment, plumbing, electrical, shear wall nailing, roof nailing etc. When completed, there shall be a final inspection and approval of the completed project.
Was this helpful?
The purpose for which a building, or part of a building, is used or intended to be used.
Was this helpful?
It is an order to correct a code violation.
Was this helpful?