Electrical Test Lab (ETL)
The ETL evaluates electrical equipment for safety, fire and shock hazards and personnel injuries in accordance with the current applicable codes and standards. Approved materials are published as Los Angeles Research Reports (LARR).
Contact the
ETL
Electrical Testing Laboratory
Address: 221 N. Figueroa St. Room 500, Los Angeles, CA 90012
Telephone: (213) 482-6721 Fax: (213) 482-6554
Engineer: Antonio Maldonado
Email: antonio.maldonado@lacity.org Telephone: (213) 482-7382
Engineer: Isaac Almaraz
Email: isaac.almaraz@lacity.org Telephone: (213) 482-0035
Engineer: Stephanie Lopez
Email: stephanie.j.lopez@lacity.org Telephone: (213) 482-0068
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- FAQ
- Forms & Applications
- Publication & Rosters
FAQ Search Results
Filtered categories:
All
Any permit other than Express Permits or the online permits require plans. For the list of the Express Permits, check the corresponding Information Bulletin.
Was this helpful?
Whenever a building is demolished, a Demo Pre-Inspection (DPI) is required. See the Information Bulletin P/BC 2014-039 available on LADBS.ORG for more information.
Was this helpful?
Most of the signs except wall signs, under certain conditions, require a Sign Pre-Inspection (SPI) report. See the Information Bulletin P/BC 2014-078 for more information.
Was this helpful?
Call for initial inspection after HVAC is installed and ducts sealed and prior to drywall installation.
Was this helpful?
Please see Information Bulletin P/BC 2014-060 for a detailed explanation.
Was this helpful?
You need to get a Title 24, Part 6 State energy regulation compliance plan check whenever you alter, repair, add, modify or install new lighting, or install new service or distribution systems as described in the California Energy Code.
Was this helpful?
In general, "Graywater Ready Systems" shall be provided for all building plans submitted after June 6, 2016.
Was this helpful?
Storage tanks for fire protection are required for new high-rise buildings over 75 ft. and for existing building falling under the scope of chapter 86 of LABC when the building height exceeds 150 ft.
Was this helpful?
A grading bond is required for projects with over 250 CY of cut or fill in a Hillside Grading Area.
Was this helpful?
Filtered categories:
Filtered categories: