Building Permits
Building Permits are required for new constructions, additions, alterations, and demolition/removal of a building or structure.
About Building Permits
Building plans shall be filed and approved by the Department (as a Building Plan Check) before any permit is issued for the following:
- New building or structure
- Addition to building
- Structural alteration to building or structure
- Interior modification and change of floor plan
- Change of use and/or occupancy
- Parking layout change
- Use-of-land, such as recycling deposit center, open air storage, outdoor temporary events
- Signs and sign structures
- Fences, retaining walls and shoring plans
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
Filtered categories:
Supplemental Correction Sheet for The Baseling Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 3/17/17)
PC/STR/Corr.Lst.107A-2020
Supplemental Correction Sheet for The Baseling Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 3/17/17)
PC/STR/Corr.Lst.107A-2020
Supplemental Correction Sheet for Type I and II Kitchen Systems
PC/MECH/Corr.Lst.60-2023
Supplemental Correction Sheet: MWELO
PC/GRN/Corr.Lst.05-2016
- Effective
Supplemental Correction Sheets for Cable Elevators
PC/MECH/Corr.Lst.27-2014
Supplemental Correction Sheets for Cable Elevators (for 2011 Codes)
PC/MECH/Corr.Lst.27-2011
Supplemental Correction Sheets for Garage Ventilation System
PC/MECH/Corr.Lst.29-2014
Supplemental Correction Sheets for Garage Ventilation System (for 2011 Codes)
PC/MECH/Corr.29-2011
Supplemental Correction Sheets for Garage Ventilation System (for 2017 Codes)
PC/MECH/Corr.Lst.29-2017
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
Filtered categories:
Supplemental Correction Sheet for The Baseling Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 3/17/17)
PC/STR/Corr.Lst.107A-2020
Supplemental Correction Sheet for The Baseling Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 3/17/17)
PC/STR/Corr.Lst.107A-2020
Supplemental Correction Sheet for Type I and II Kitchen Systems
PC/MECH/Corr.Lst.60-2023
Supplemental Correction Sheet: MWELO
PC/GRN/Corr.Lst.05-2016
- Effective
Supplemental Correction Sheets for Cable Elevators
PC/MECH/Corr.Lst.27-2014
Supplemental Correction Sheets for Cable Elevators (for 2011 Codes)
PC/MECH/Corr.Lst.27-2011
Supplemental Correction Sheets for Garage Ventilation System
PC/MECH/Corr.Lst.29-2014
Supplemental Correction Sheets for Garage Ventilation System (for 2011 Codes)
PC/MECH/Corr.29-2011
Supplemental Correction Sheets for Garage Ventilation System (for 2017 Codes)
PC/MECH/Corr.Lst.29-2017
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
Filtered categories:
Supplemental Correction Sheet for The Baseling Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 3/17/17)
PC/STR/Corr.Lst.107A-2020
Supplemental Correction Sheet for The Baseling Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 3/17/17)
PC/STR/Corr.Lst.107A-2020
Supplemental Correction Sheet for Type I and II Kitchen Systems
PC/MECH/Corr.Lst.60-2023
Supplemental Correction Sheet: MWELO
PC/GRN/Corr.Lst.05-2016
- Effective
Supplemental Correction Sheets for Cable Elevators
PC/MECH/Corr.Lst.27-2014
Supplemental Correction Sheets for Cable Elevators (for 2011 Codes)
PC/MECH/Corr.Lst.27-2011
Supplemental Correction Sheets for Garage Ventilation System
PC/MECH/Corr.Lst.29-2014
Supplemental Correction Sheets for Garage Ventilation System (for 2011 Codes)
PC/MECH/Corr.29-2011
Supplemental Correction Sheets for Garage Ventilation System (for 2017 Codes)
PC/MECH/Corr.Lst.29-2017
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
Filtered categories:
Supplemental Correction Sheet for The Baseling Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 3/17/17)
PC/STR/Corr.Lst.107A-2020
Supplemental Correction Sheet for The Baseling Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 3/17/17)
PC/STR/Corr.Lst.107A-2020
Supplemental Correction Sheet for Type I and II Kitchen Systems
PC/MECH/Corr.Lst.60-2023
Supplemental Correction Sheet: MWELO
PC/GRN/Corr.Lst.05-2016
- Effective
Supplemental Correction Sheets for Cable Elevators
PC/MECH/Corr.Lst.27-2014
Supplemental Correction Sheets for Cable Elevators (for 2011 Codes)
PC/MECH/Corr.Lst.27-2011
Supplemental Correction Sheets for Garage Ventilation System
PC/MECH/Corr.Lst.29-2014
Supplemental Correction Sheets for Garage Ventilation System (for 2011 Codes)
PC/MECH/Corr.29-2011
Supplemental Correction Sheets for Garage Ventilation System (for 2017 Codes)
PC/MECH/Corr.Lst.29-2017
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020