Disabled Access and Accessibility
Plans submitted for new construction or alteration to an apartment and/or commercial building for a building permit will also be separately reviewed for disabled access and accessibility.
Additional Resources
- Documents & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
- Standard Plans
Filtered categories:
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
Plan Check Correction Sheet for Mechanical Systems
PC/MECH/Corr.Lst.58-2023
Supplemental Correction Sheet for Type I and II Kitchen Systems
PC/MECH/Corr.Lst.60-2023
Filtered categories:
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2023-098
- Effective
Structural Design Requirements (Seismic Provisions) for Existing Building Converted to Joint Living and Work Quarters
IB/P/BC 2011-110
- Effective
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2023-117
- Effective
Submittal Requirements for One-Story Addition to Residential Buildings for Over-The-Counter Plan Check
IB/P/GI 2023-020
- Effective
Filtered categories:
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2023-098
- Effective
Structural Design Requirements (Seismic Provisions) for Existing Building Converted to Joint Living and Work Quarters
IB/P/BC 2011-110
- Effective
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2023-117
- Effective
Submittal Requirements for One-Story Addition to Residential Buildings for Over-The-Counter Plan Check
IB/P/GI 2023-020
- Effective
Filtered categories:
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2023-098
- Effective
Structural Design Requirements (Seismic Provisions) for Existing Building Converted to Joint Living and Work Quarters
IB/P/BC 2011-110
- Effective
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2023-117
- Effective
Submittal Requirements for One-Story Addition to Residential Buildings for Over-The-Counter Plan Check
IB/P/GI 2023-020
- Effective