Mechanical HVAC Permits
Mechanical HVAC Permits are required for any installation or modification of heating/cooling systems, smoke control systems, hood and ventilation systems, or engineered water heater/heating appliance vents.
About Mechanical HVAC Permits
Plans shall be filed with and approved by the Department (as an HVAC Plan Check) before any permit is issued for work listed below is started:
- Installations where the aggregate BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over, for comfort heating, or for comfort-cooling, or for absorption units for commercial applications
- Installations where the system BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over for comfort heating, or for comfort cooling, or for absorption units for residential applications
- Smoke-control systems
- Any comfort-cooling compressor or refrigeration compressor for any system which contains any Group B refrigerant
- Any commercial cooking hood and ventilation system
- Product conveying ventilation systems
- Engineered water heater/heating appliance vents
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Standard Correction Lists
Filtered categories:
Acceptable Design and Analysis Methods for Use of Slabs-On-Grade As Foundations
IB/P/BC 2023-100
- Effective
Methane Hazard Mitigation Standard Plan Simplified Method for Small Additions
IB/P/BC 2023-102
- Effective
Use of Sump Pumps for Surface and Subsurface Drainage
IB/P/BC 2023-103
- Effective
Guardrail Requirements Adjacent to Openable Windows
IB/P/BC 2023-105
- Effective
Water Curtain in Lieu of Protected Exterior Openings
IB/P/BC 2023-106
- Effective
Guidelines for Vehicle Sales Use of Land Permit
IB/P/BC 2023-107
- Effective
Guidelines for the Issuance of Certificates of Occupancy for Commercial or Residential Core & Shell Buildings
IB/P/BC 2023-122
- Effective
Filtered categories:
Inspection Requirements for Anchors in Concrete Supporting Fire Sprinkler Lateral Braces
IB/P/BC 2023-124
- Effective
Installation of Equipment Prior to Test Lab Approval
PC/ELEC/Mod13-2017
Instructions for Completing Application Forms for Research Reports (LARR) and Research Report Fees
Instructions for Completing Application Forms for Research Reports (LARR) and Research Report Fees
Filtered categories:
Inspection Requirements for Anchors in Concrete Supporting Fire Sprinkler Lateral Braces
IB/P/BC 2023-124
- Effective
Installation of Equipment Prior to Test Lab Approval
PC/ELEC/Mod13-2017
Instructions for Completing Application Forms for Research Reports (LARR) and Research Report Fees
Instructions for Completing Application Forms for Research Reports (LARR) and Research Report Fees