Mechanical HVAC Permits
Mechanical HVAC Permits are required for any installation or modification of heating/cooling systems, smoke control systems, hood and ventilation systems, or engineered water heater/heating appliance vents.
About Mechanical HVAC Permits
Plans shall be filed with and approved by the Department (as an HVAC Plan Check) before any permit is issued for work listed below is started:
- Installations where the aggregate BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over, for comfort heating, or for comfort-cooling, or for absorption units for commercial applications
- Installations where the system BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over for comfort heating, or for comfort cooling, or for absorption units for residential applications
- Smoke-control systems
- Any comfort-cooling compressor or refrigeration compressor for any system which contains any Group B refrigerant
- Any commercial cooking hood and ventilation system
- Product conveying ventilation systems
- Engineered water heater/heating appliance vents
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Standard Correction Lists
Filtered categories:
Power Driven Steel Studs in Pre-Stressed/Post-Tensioned Concrete Elements
IB/P/BC 2026-015
- Effective
Onsite Wastewater Treatment System (OWTS) (Residential)
IB/P/BC 2026-027
- Effective
Nuclear Devices for Soil Density and Moisture Determination
IB/P/BC 2026-028
- Effective
Interconnection Ties for Individual Pile Caps and Caissons
IB/P/BC 2026-030
- Effective
Supplementary Rules and Regulations Governing Fabricators of High-Strength Structural Steel
IB/P/BC 2026-032
- Effective
Exemptions from Liquefaction, Earthquake Induced Landslide, and Fault-rupture Hazard Zone Investigations
IB/P/BC 2026-044
- Effective
Filtered categories:
Filtered categories: