Mechanical HVAC Permits
Mechanical HVAC Permits are required for any installation or modification of heating/cooling systems, smoke control systems, hood and ventilation systems, or engineered water heater/heating appliance vents.
About Mechanical HVAC Permits
Plans shall be filed with and approved by the Department (as an HVAC Plan Check) before any permit is issued for work listed below is started:
- Installations where the aggregate BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over, for comfort heating, or for comfort-cooling, or for absorption units for commercial applications
- Installations where the system BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over for comfort heating, or for comfort cooling, or for absorption units for residential applications
- Smoke-control systems
- Any comfort-cooling compressor or refrigeration compressor for any system which contains any Group B refrigerant
- Any commercial cooking hood and ventilation system
- Product conveying ventilation systems
- Engineered water heater/heating appliance vents
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Standard Correction Lists
Filtered categories:
GRN 22 Commissioning Measures in Construction Documents
PCF-GRN-2026-022
- Effective
GRN 23 Commissioning Plan Compliance Form
PCF-GRN-2026-023
- Effective
GRN 24 Functional Performance Testing Compliance Form
PCF-GRN-2026-024
- Effective
GRN 25 Documentation and Training Compliance Form
PCF-GRN-2026-025
- Effective
GRN 26 Commissioning Report Compliance Form
PCF-GRN-2026-026
- Effective
WS-4 Whole Building Life Cycle Assessment
PCF-GRN-2026-028
- Effective
Maintenance of Uncertified Fill Underground Structures (for 2011 Codes)
PC/GRAD/Aff04-2008
Filtered categories:
Streamlined Permitting of Unpermitted Dwelling Unit as ADU/JADU Under AB 2533
IB-BC-2026-009
- Effective
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Design Guidelines for Non-Ductile Concrete Buildings
IB/P/BC 2026-152
- Effective
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2026-098
- Effective
Structural Design Requirements (Seismic Provisions) for Existing Building Converted to Joint Living and Work Quarters
IB/P/BC 2011-110
- Effective
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2026-117
- Effective
Filtered categories:
Streamlined Permitting of Unpermitted Dwelling Unit as ADU/JADU Under AB 2533
IB-BC-2026-009
- Effective
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Design Guidelines for Non-Ductile Concrete Buildings
IB/P/BC 2026-152
- Effective
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2026-098
- Effective
Structural Design Requirements (Seismic Provisions) for Existing Building Converted to Joint Living and Work Quarters
IB/P/BC 2011-110
- Effective
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2026-117
- Effective