Permits for simple projects, which do not require plan check, are readily issued as Express Permits or e-permits when done online.
All contractors must complete a subcontractor form providing information on any subcontractors used on the project. This form must be returned to the Office of Finance
Filtered categories:
Based on the height district and the type of construction, the building can be single-story to unlimited.
Was this helpful?
A permit is valid for two years from the time the permit fees are paid. Each permit extension is good for 6-month within the two years limit.
Was this helpful?
For elevator buildings, all units on floors served by the elevator must be accessible. For non-elevator buildings, all ground floor units must be accessible.
Was this helpful?
Was this helpful?
Fees are $550.00 for failure to comply within 15 days of the compliance date.
Was this helpful?
Please refer to Department fee schedule online for general fees. Final fees to be determined at the time of submittal.
Was this helpful?
The fee is based on the nature of the appeal and the number of the appealed items. See the Information Bulletin P/ZC 2014-019 for more information.
P/ZC 2014-019Was this helpful?
The inspector assigned to your project can explain the required fees for a permit extension.
Was this helpful?
The Plan Check staff assigned to your project can explain the required fees for the plan check extension for your project.
Was this helpful?
The fee is calculated in accordance to code section 93.0213. Each electrical component is itemized as a fee item. You may calculate the fee on our website using the Permit Fee Calculator.
Was this helpful?