Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2023 LABC)
PC/STR/Corr.Lst.045-2023
Supplemental Structural Correction Sheet Steel Moment Frame Design (2017 LABC)
PC/STR/Corr.Lst.052-2017
Supplemental Plan Check Correction Sheet for Steel Moment Frame Design (2023 LABC)
PC/STR/Corr.Lst.052-2023
Supplemental Plan Check Correction Sheet for Unreinforced Masonry (URM) Retrofit (2026 LABC)
PC/STR/Corr.Lst.053-2026
- Effective
Supplemental Plan Check Correction Sheet for Methane Seepage Regulations (2023 LABC)
PC/STR/Corr.Lst.055-2023
Counter Plan Check Correction Sheet (2023 LABC/LARC)
PC/STR/Corr.Lst.058-2023
Counter Plan Check Correction Sheet (2026 LABC)
PC/STR/Corr.Lst.058-2026
- Effective
Signs-General Plan Check Correction Sheets (2023 LABC)
PC/STR/Corr.Lst.059-2023
Supplemental Correction Sheet for Stormwater SUSMP & SSMP (for 2011 Codes)
PC/STR/Corr.Lst.101-2010
Supplemental Plan Check Correction Sheet for Structural Design - General (2023 LABC)
PC/STR/Corr.Lst.104-2023