Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.057-2026
- Effective
Supplemental Plumbing Correction Sheet for High-Rises (for 2011 Codes)
PC/MECH/Corr.Lst.106-2011
City of L.A. Plumbing Plan Check Correction List
PC/MECH/Corr.Lst.106-2026
- Effective
Untreated Gray Water Correction Sheet (for 2026 Codes)
PC/MECH/Corr.Lst.107-2026
- Effective
On-Site Treated Gray Water Correction Sheet
PC/MECH/Corr.Lst108-2026
- Effective
Plan Check Correction Sheet for Non-potable Rainwater Catchment System (2023)
PC/MECH/Corr.Lst.109-2023
Non-potable Rainwater Catchment System Correction Sheet
PC/MECH/Corr.Lst.109-2026
- Effective
Non-potable Water Reuse (Recycled) Correction Sheet (for 2017 Codes)
PC/MECH/Corr.Lst.110-2026
- Effective
Plan Check Correction Sheet for Plumbing Systems (2023)
PC/MECH/Corr.Lst.111-2023
Plan Check Correction Sheet for Methane Mitigation Systems (2023)
PC/MECH/Corr.Lst.112-2023