Any permit other than Express Permits or the online permits require plans. For the list of the Express Permits, check the corresponding Information Bulletin.
When do I need to apply for a Demolition Pre-Inspection (DPI)?
Whenever a building is demolished, a Demo Pre-Inspection (DPI) is required. See the Information Bulletin P/BC 2014-039 available on LADBS.ORG for more information.
When do I need to apply for a Grading Pre-Inspection (GPI)?
A Grading Pre-Inspection (GPI) is required for any grading work on a property which is within LA City Special Grading Area. Check ZIMAS to see if your property is in the Special Grading Area.
When do I need to apply for a Sign Pre-Inspection (SPI)?
Most of the signs except wall signs, under certain conditions, require a Sign Pre-Inspection (SPI) report. See the Information Bulletin P/BC 2014-078 for more information.
Can I ask for a permit extension if my permit has expired?
No, a permit is valid for two years from the time the permit fees are paid. You will need to obtain a new permit for the remaining work not completed under the expired permit.