What do I need to apply for Demolition Pre-Inspection (DPI) report?
A plot plan showing the location of each building to be demolished. Specify the number of the story(s), the use, the floor area, and the distance of each building from the property lines.
What do I need to apply for Grading Pre-Inspection (GPI) Report?
You will need at least a plot plan to show the area of the propose grading and foundation work along with the cross-sections for the grading/foundation work.
You will need to show a proof that you have been residing in the unit for which you are pulling a permit. A DWP statement or a Gas Company statement will be acceptable.