Skip to main content
Displaying 4421 - 4430 of 4530 results
What are the different approvals I can get from LADBS-MTL?

One-time Approval. This approval is granted for fixtures and equipment that are custom made or installed at a specific job site. The evaluation and testing can often be performed at the location where the fixture/equipment is installed.

Published:
    Read FAQ
What is the process of obtaining an LADBS-MTL approval?

The process to obtain a Los Angeles City Mechanical Research Report consists of the following steps:

Published:
    Read FAQ
How can I obtain an application for product approval?

The application form can be found on the website here o

Published:
    Read FAQ
How long does it take to obtain LADBS-MTL approval for a product?

It depends on the backlog at the time the application is submitted. The backlog information is provided to applicants at the time of submittal. The backlog is the time it takes to assign an application and report to an LADBS-MTL engineer to be processed from the submittal date.

Published:
    Read FAQ
Who can apply for approval?

Published:
    Read FAQ
How long is the approval good for, and where do I find it?

A General Approval/Laboratory Approval is valid for one year from the approval date.

Published:
    Read FAQ
Can I expedite the review process?

Expedite fee pursuant to Section 98.0433 of the Los Angeles City Municipal Code may be paid by the applicant to reduce the time it takes to assign the application to an LADBS-MTL engineer.

Published:
    Read FAQ
How can an approval be renewed?
Published:
    Read FAQ
Does electrical equipment require approval by the City of Los Angeles Building and Safety Electrical Testing Laboratory (LADBS-ETL)?

Published:
    Read FAQ
What are different approvals I can obtain from LADBS-ETL?

The LADBS-ETL offers three different types of approvals:

Published:
    Read FAQ