Skip to main content
Displaying 4411 - 4420 of 4530 results
How long a Plan Check is good for?

A Plan Check is good for 18 months from the time the plan check fees are paid.

Published:
    Read FAQ
How long do I have to wait for a Grading Pre-Inspection to be completed?

A Grading Pre-Inspection normally takes two weeks, but it could be longer.

Published:
    Read FAQ
How long do I have to wait for a Sign Pre-Inspection (SPI) to be completed?

It normally takes minimum of two weeks for a Sign Pre-Inspection (SPI) to be completed.

Published:
    Read FAQ
How can I renew my Los Angeles City Research Report?
Published:
    Read FAQ
Who can apply for a Los Angeles City Research Report?

Los Angeles Research Reports may be issued to an entity/company with the legal right to the product and the accompanying Technical Test Reports and Engineering Assessment.  Test Reports shall bear the name of the applicant, unless a release letter accompanies the test report(s).

Published:
    Read FAQ
I have a Los Angeles City Research Report (LARR) based on a Nationally Recognized Model Code Agency Evaluation Report. Is my Los Angeles City Research Report Approved for the Current Los Angeles City Building Code (LABC)?

Your products are approved for the Code version only listed on both the Evaluation Report and the LARR approval letter.  If either product approval document does not list the current version of the Building Code, you will need to have these updated.

Published:
    Read FAQ
I have a Los Angeles City Research Report (LARR). How do I know if my approval is applicable to the current code?

The LARR may be used only for projects permitted under the Code version specified on the LARR.

Published:
    Read FAQ
Los Angeles City Research Reports are allowed to be based on an Evaluation Report from a Nationally Recognized Model Code Agency. Who are Nationally Recognized Model Code Agencies currently accepted by LADBS Building Research Section?
Published:
    Read FAQ
I have a technical change I want to include to my Los Angeles City Research Report and I also need to renew my current Research Report. What are the fees and what forms do I need to fill out?

 

Two forms must be completed together:

Published:
    Read FAQ
Do plumbing and mechanical equipment and fixtures require approval by LADBS-MTL?

No, provided the equipment or fixture is listed by an approved listing agency to meet the applicable standards listed in the code.

Published:
    Read FAQ