Skip to main content
How do I contact the LADBS Custodian of Records if I have questions?

LADBS Custodian of Records
201 N. Figueroa St., Suite 1325
Los Angeles, CA 90012
(213) 482-6770
ladbs.custodianofrecords@lacity.org

    Read FAQ
Asbestos Fireproofing Removal and Replacement Procedures
IB/P/BC 2026-066
Effective Date:
       
Standard Quality Assurance Plan for Steel Moment Frames, Sheet 2 of 3
       
Methane Standard Plan 6 of 8
       
How much would it cost to get approval for an electrical equipment?

The cost depends on the type of equipment and type of approval. Fees are based on the LAMC fee ordinance. Please contact ETL at 323-224-2168 to get an accurate quote for the evaluation process.

    Read FAQ
What are different approvals I can obtain from LADBS-ETL?

The LADBS-ETL offers three different types of approvals:

    Read FAQ
How do I get my plans checked?

For small to medium projects, you may visit the Metro (Downtown), Van Nuys, and

    Read FAQ
Guidelines for Storm Water Infiltration
IB/P/BC 2026-118
Effective Date:
       
Supplemental Correction Sheet for Adaptive Reuse (P/BC 2002-009) (for 2011 Codes)
PC/STR/Corr.Lst.32-2014
       
Hillside Construction Regulations (HCR)
    Read More  
How will the foundation be established for the rebuild after it is removed?

If the foundation was removed, LADBS would use available records to establish where the footprint of the foundation was originally. Please see question above regarding what records LADBS will use to establish what was on a site prior to the wildfire.

    Read FAQ
Zoning Code Requirements for Automobile Dismantling Yards, Junk Yards, Scrap Metal Yards, or Open Air Storage of Used Materials, etc
IB/P/ZC 2023-013
       
I am using listed components in my panel. Why do I need approval for the panel?

The overall system needs to be evaluated and approved, not just individual components.

    Read FAQ
What do I need to pull a permit as a contractor?

See the Information Bulletin P/GI 2014-001 for more information.

    Read FAQ
Disclaimer
    Read More  
YD Group - ADU80
    Read More  
How long is a plan check application good for?

Plan check applications expire 18 months after the plan check fees are paid.

    Read FAQ
Plan Check Notes: Residential Buildings
GRN 14-2018
       
Supplemental Correction Sheet for Electrical Fire Pump System (for 2011 Codes)
PC/ELEC/Corr.Lst.24-2009
       
Can there be other residential uses on the Lot besides the proposed or existing dwelling mentioned in LAMC 12.22 A.33(c)(6)?

Yes, the Lot may contain any other residential use(s), in addition to the non-residential uses and accessory residential uses mentioned in 12.22 A.33(c)(6)

    Read FAQ