Do I have to install a hood in a residential kitchen?
A hood is not required for residential kitchens. However, it is required to provide kitchen ventilation for removing moisture.
How long does take to assign my plan to a plan check engineer?
The time to assign the plans changes from week to week. Normally, regular plan check submittals take 15 to 30 business days, and expedite submittals will take 6 to 10 days. These estimates are subject to change.
What do I need to apply for Demolition Pre-Inspection (DPI) report?
A plot plan showing the location of each building to be demolished. Specify the number of the story(s), the use, the floor area, and the distance of each building from the property lines.
How much will the permitting fees be when I decide to move forward with a Pre-Approved Standard Plan?
Architects, Engineers, Designers and Builders are responsible for paying the necessary plan check and permit fees required to have their designs reviewed and pre-approved for inclusion in the Standard Plan Pilot Program.
When do I need to apply for a Sign Pre-Inspection (SPI)?
Most of the signs except wall signs, under certain conditions, require a Sign Pre-Inspection (SPI) report. See the Information Bulletin P/BC 2014-078 for more information.
About the Construction Process
Is there a limitation on the number of items I am appealing on one appeal?
No. You can appeal as many items as you want. The fees you will need to pay for the appeal will be determined based on the number of the items you are appealing.
Does LADBS issue a permit for a private school?
Yes, but LADBS does not issue permits for a public school.
Do I need plan check to install a sewage ejector?
Yes, plan check is required for sewage ejector per Section 101.5.6 of the Los Angeles Plumbing Code (LAPC).
What is the scope of this program?
This program applies to all existing buildings with the following criteria: