What is ePlanLA?
ePlanLA, short for Electronic Plan Review Los Angeles, is an online service for submitting plans for plan check, applying for permits, and tracking the progress of these applications. Plans submitted must be scaled pdf drawings.
Can I start work before I obtain my permit?
No, work cannot be started until a valid permit is issued.
When do I need to get Title 24, Part 6 energy plan checked?
You need to get a Title 24, Part 6 State energy regulation compliance plan check whenever you alter, repair, add, modify or install new lighting, or install new service or distribution systems as described in the California Energy Code.
Are you requesting data?
Explore extensive information and valuable insights! Uncover data from various city departments, including LADBS programs.
When is a building verification required?
Building verification is required after all other division clearances have been obtained.
Victor Cuevas
- Oversees the following Building and Safety operations:
- Residential Inspection
- Residential Demolition Pre-Inspection Permits (DPI)
- Residential Construction Inspections
- Compliance with All Ordinances and City Planning Requirement
- Grading Division
Can I expand my second story?
A second story that existed prior to the wildfire may be rebuilt and expanded as part of a like-for-like +10% project, so long as it complies with maximum allowable height and building footprint.
What items are required for plan check submission using an ADU Pre-Approved Standard Plan.
- To obtain a building permit, you will need to provide a completed Building Permit Application, a copy of the LA City approved stamped ADU Standard Plan, and plans indicating how the Standard Plan will be adapted to a specific site.