Skip to main content
I get an error message when I try to request my fire sprinkler, elevator, or pressure vessel inspections. Can I use the internet to request these types of inspection?

No. You must contact the inspector directly to request these types of inspections.

    Read FAQ
How do I submit plans for Green Building Plan Check?

During the regular plan check submittal process, an additional set of plans is collected and routed for Green Building section for review and approval process, if required.

    Read FAQ
ED 1 - Expedition of Permits and Clearances for Temporary Shelters and Affordable Housing Types
       
How many sprinkler heads do I need to hydraulically calculate for a single family dwelling sprinkler system?

Maximum two residential heads shall be hydraulically calculated for the design criteria listed in section 10.2.1 of NFPA 13D.

    Read FAQ
Supplemental Plan Check Correction Sheet For LA Residential Code Wood Prescriptive Design (2020 Los Angeles Residential Code)
PC/STR/Corr.Lst.020B-2020
       
Are there ADA requirements at special events?

Yes, ADA restrooms and parking at events must meet ADA requirements.

    Read FAQ
What is the estimated cost for the records?

The cost can range anywhere from 10¢ (cents) per page to $1.50 per page.

    Read FAQ
Non-listed Onsite Graywater Treatment System
PC/ALL/Mod106-2017
       
Vertical Reciprocating Conveyor Mechanic
       
ARCx Before You Begin Notes-100422
       
Plumbing Fixture Flow Rate Tables (Residential)
GRN 16-2020
       
Whom can I contact for ePlanLA assistance?

Contact information for plan review questions
Online: https://buildla.lacity.org/contact-form.html

    Read FAQ
Green Building & Sustainability
    Read More  
When is a electrical verification required?

When clearance for the electrical is required to process the Certificate of Occupancy.

    Read FAQ
ARCx Completion of Water-100421
       
As a homeowner, can I obtain an electrical permit?

If you have resided in the house for 12 months or more.

    Read FAQ
What is an Order to Comply?

It is an order to correct a code violation.

    Read FAQ
How do I get hold of my plan check engineer?

You may view our employee directory on the LADBS website to look up your plan checker contact information.

    Read FAQ
When do I need to apply for a Demolition Pre-Inspection (DPI)?

Whenever a building is demolished, a Demo Pre-Inspection (DPI) is required. See the Information Bulletin P/BC 2014-039 available on LADBS.ORG for more information.

    Read FAQ
AB 3002 Notice in Vietnamese