Skip to main content
Is a slope-band analysis required?

A slope band analysis is not required if rebuilding as a like-for-like +10% project. Otherwise, projects within a designated hillside area will require a slope band analysis.

    Read FAQ
How high can my building be?

A height of a building is limited per the zoning designation of the property. Visit a LADBS office Zoning counter for more information. A building code also limits the height of a building based on the type of construction and the occupancy of the building.

    Read FAQ
EBEWE Scope and Instructions 2018
       
Ordinance 186485
       
How do I know when my Demolition Pre-Inspection (DPI) is completed?

You can check with the office where you submitted your Demo Pre-Inspection (DPI) application for the status. You will be called once the GPI is ready.

    Read FAQ
ADU Garage Designs - ADU90
    Read More  
Prescriptive Standards for Suspended Ceiling Assemblies
IB/P/BC 2023-040
Effective Date:
       
What is retrofit?

Retrofit is an improvement to your building by altering or adding any structural elements.

    Read FAQ
Property Records
    Read More  
Signature Declaration Form
       
How do I apply for refund of Grading bond?

Please contact LADBS Grading Division for any Grading bond refund request.

    Read FAQ
ARCx Correct or Change a Request-100422
       
Supplemental Plan Review Checklist No. 9 - Public Housing
PC/DAD/Corr.Lst.09-2020
       
Owner's Project Requirements (OPR) Compliance Form
GRN 20-2023
Effective Date:
       
BUILDING STANDARDS FOR IMMEDIATE ENFORCEMENT EXTERIOR ELEVATED ELEMENTS (EEE)
IB/P/BC 2023-144
Effective Date:
       
Adaptive Reuse Plan Check Correction Sheets (2020 LABC)
PC/STR/Corr.Lst.032-2020
       
What do I need to pull a permit as an authorized agent for a contractor?

See the Information Bulletin P/GI 2014-001 for more information.

    Read FAQ
Exterior Wall Protection at Openings
PC/STR/Mod43-2020
       
What information do you need at the time of application submittal?

Current product literature, owner’s manual, schematic wiring diagrams and parts list, installation instruction (if applicable), and a production sample of the equipment with all the options and accessories.

    Read FAQ
neXt Dwelling - ADU67
    Read More