Skip to main content
test page
    Read More  
Green Building Code Correction Sheet for Additions and Alterations to Residential Buildings
PC/GRN/Corr.Lst.Res-AA-2023
Effective Date:
       
Who releases my bond?

The district grading inspector will clear the release of the bond upon completion of the work. Financial Services will release the bond amount.

    Read FAQ
Accessory and Junior Accessory Dwelling Units / Permitted & Unpermitted Buildings
IB/P/BC 2023-150
Effective Date:
       
Wood-frame Seismic Retrofit
       
Early Release of Electrical Power and Gas Supply System
IN/Mod10-2016
       
Certificate of Occupancy
IB/P/BC 2023-109
Effective Date:
       
How do I know when my project needs to comply with Energy requirements?

All new buildings, additions or remodeling which introduces new exterior openings need to comply with the current energy regulations.

    Read FAQ
Benchmarking 2018
    Read More  
Vacant Building Abatement
       
Electrical Test Lab (ETL)
    Read More  
Application Package for Accreditation of Electrical Testing Laboratory
Req/Form10-2017
       
Can I use ABS pipe in a residential building?

Plastic waste and vent piping in residential occupancies are allowed when the residential portion of the building is 2 stories or less.

    Read FAQ
Commissioning Report (for 2011 Codes)
GRN 26-2011
       
NFPA 14 2024 - Plan Check Correction Sheet
PC/MECH/NFPA14-2024
Effective Date:
       
How many dwelling units can I add or build before DA requirements kick in?

Addition of 3 or more newly-constructed units will trigger DA requirements.

    Read FAQ
Maintenance of Building (Vehicle Life System - 2 Levels) (for 2011 Codes)
PC/STR/Aff43-2012
       
Methane Hazard Mitigation Standard Plan Simplified Method for Small Additions
IB/P/BC 2023-102
Effective Date:
       
Good Neighbor Construction Practices
       
Structural Observation
IB/P/BC 2023-024
Effective Date: