How long is the approval good for, and where do I find it?
A General Approval/Laboratory Approval is valid for one year from the approval date.
Do I need to tie my two properties if I want to build one house over two properties?
Yes, a Lot Tie affidavit will be required to create one lot in order to build a building over two lots. The lots shall be owned by the same owner in order to be tied together.
What piping material I can use for subsoil drainage system?
The acceptable pipe material for subsoil drain are listed in table 1102.5 of LAPC. Acceptable pipe material are Asbestos Cement, PE, PVC, and Clay.
I am installing a new elevator in an existing building. Does it need to comply with the requirements for medical emergency elevators?
If the building was built prior to 1/26/1988, the elevator does not have to comply with the requirements for medical emergency elevators.
How do I know if the equipment is still approved?
Make sure that the equipment approval has not expired by checking the equipment approval letter. Each letter has an approval and expiration date that is indicated on the top right hand of the letter.
How are the fees calculated for a TCO?
The fees are calculated by the type of occupancy.