What do I need in order to demolish a building which is a historic building?
You will need approval from the Department of City Planning Office of Historic Resources.
When is a Certificate of Occupancy required?
A Certificate of Occupancy is required for new buildings, additions, change of use or occupancy.
Which are the requirement in a soils, geology or combined soils and geology report?
The minimum content required in a report is outlined in Information Bulletins P/BC 2014-113 and
Can the approval process be expedited?
Yes. Section 98.0422 of the Los Angeles City Municipal Code allows expedited review process when an amount of a fee equal to one-half of the review fee, in addition to the normal review fee, is paid.
What is an express permit?
A permit that does not require plans or plan check. Here is a link to a detailed list of express permits.
Who is my inspector?
Inspectors are assigned to a district in PCIS. You can check property activity reports on the LADBS website.
Can I select more than one inspection type?
Yes. You may select as many inspection types as you wish. Please limit your selection(s) to work that is ready to be inspected.
Does the density calculation described in LAMC Section 12.22 A.33(h)(2) only apply to dwelling unit calculations?
No, this provision applies if either additional dwelling units or guest rooms are added to a lot after the creation of the ADU or JADU.
How are "prevailing setbacks" determined?
Prevailing setbacks apply to areas with developed lots (where some homes burned down, and with some homes still standing) of varying front yard setbacks. See
How can I tell if a product is approved to be used in the City of Los Angeles?
A product (or equipment) is considered approved if it bares either the approval label of the City of Los Angeles Electrical Test Lab, or listing or certification label, symbol or other identifying mark of a recognized testing agency.