When is a drywall inspection required?
When all wallboard has been installed and nailed or screwed in.
Do I need plan check if I am adding plumbing fixtures in an existing building that has a main pipe 2 inches diameter or larger?
Plan check is not required for existing systems that are added added or altered with branch lines serving less than 20 fixture units and sized per table 610.4.
How many inspections can I have with this permit?
Depending on the project, there could be one or as many as needed to complete the project.
Los Angeles City Permitting System (LACPS) Updates
How do I obtain staff assistance for my express permit without visiting a LADBS office?
You can visit our website for Express Permits.
ADU Garage Designs - ADU91
Green Building Inspection
When does my approved Import/Export Application expire? Can I get an extension?
An import/export approval is valid for twelve months from the date of the Board’s action. The BBSC does not grant extensions on import/export applications.
Do the inspectors work weekends for special events?
Yes, staff work days include Saturday and Sunday.