Skip to main content
Title 24, California Code of Regulations - Accessibility Regulations Supplemental Correction List No. 5 (for 2011 Codes)
PC/DAD/Corr.Lst.5-2011
       
How many sets of plans do I need at the time of filing for plan check, and at permit issuance?

At the time of filing:

    Read FAQ
Supplemental Plumbing Correction Sheet for High-Rises (for 2011 Codes)
PC/MECH/Corr.Lst.106-2011
       
Existing Escalator Clearance Between the Skirt and the Step
IB/P/EV 2002-001
Effective Date:
       
Parcel Profile Report
    Read More  
Covenant and Agreement Regarding Parking for Senior Citizen Housing Development (for 2011 Codes)
PC/STR/Aff30-2008
       
ADU Garage Designs - ADU89
    Read More  
Home Page
    Read More  
ADU Standard Plan Building Permit Submittal Checklist
       
Newly Constructed Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.04-2026
Effective Date:
       
Who can apply for approval?

    Read FAQ
Electrical Inspection
    Read More  
Floor Control Valves (for 2011 Codes)
PC/MECH/Mod32-2013
       
Boiler and Gas-Fired Water Heater Venting
IB/P/PC 2023-002
Effective Date:
       
When do I need a permit for my fence?

No permit is required for a wood fence or wrought iron fence up to 10 feet.

    Read FAQ
Anchor Bolting Bracing Foundation Drawing
       
Guidelines for Plan Check and Permit Requirements for Solar Energy Systems
IB/P/GI 2023-027
Effective Date:
       
Can I obtain a permit over the phone?

No.

    Read FAQ
For the purpose of assessing a per-unit impact fee to an ADU that is 750 square feet or larger on a Lot with an existing single-family dwelling, how is the square footage of the single-family dwelling determined?

Los Angeles County Tax Assessor’s records may be used to establish the square footage of the single-family dwelling for the purpose of calculating the required impact fee for the ADU.

    Read FAQ
Local Enforcement Agency
    Read More