Skip to main content
Regular Plan Check
    Read More  
What are the time limits to comply?

Within two (2) years after the service date of the Order to Comply, a structural analysis and plans to either retrofit or demolish, or proof of previous retrofit shall be submitted to the Department for review if the building meets the minimum requirements of this ordinance.

    Read FAQ
There is an error on my permit. How can I get it corrected?

You can visit one of our development centers and apply for your permit in person by making the required appointment t

    Read FAQ
Determination Letter
    Read More  
Villa Homes
    Read More  
Mandatory Requirements Checklist: Additions and Alterations to Residential Buildings
GRN 9-2023
Effective Date:
       
Fire Alarm Systems Testing
       
Does the presence of a JADU change the designation of a One-Family Dwelling Unit? How is a JADU reported?

A JADU shall be identified as a JADU on Building Permits, Certificate of Occupancy and other pertinent City records. The addition of a JADU changes the designation of the One-Family  Dwelling to a One-Family Dwelling and JADU.

    Read FAQ
Does the listing mark or logo on an electrical product satisfy approval of installed product?

In general yes; however, if fraudulent, counterfeited, or non-applicable listing mark or logo is used on the electrical products, or if the installer misapply or use the product for other than its intended purpose, or if the installer does not follow the installation instructions of the product,

    Read FAQ
Supplemental Plan Check List for Concrete Shear Wall (2014)
PC/STR/Corr.Lst.034-2014
       
Drainage Easement
PC/GRAD/Aff6-2016
       
Grading Plan Check and Permit Fees
PC/GRAD/GGI16-2009
Effective Date:
       
What do I need to apply for Grading Pre-Inspection (GPI) Report?

You will need at least a plot plan to show the area of the propose grading and foundation work along with the cross-sections for the grading/foundation work.

    Read FAQ
Methane Standard Plan 2 of 8
       
Duties of a Registered Deputy Pressure Vessel Inspector
IB/P/MC 2022-009
Effective Date:
       
San Gabriel Valley Habitat for Humanity, Inc
    Read More  
Pre-scheduled Meter Set Program
       
Supplemental Plan Check Correction Sheet for Sound Transmission (2017 LABC)
PC/STR/Corr.Lst.105-2017
       
Office of Statewide Health and Planning Department Requirements (OSHPD 3) Supplemental Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.113-2017
       
City Planning Development Services Centers Closed Monday, Feb. 9 and Friday, March 27 Due to Budget-Required Furlough

Dear Customers,

    Read More