Skip to main content
What is the difference between a Modification and a Variance?

A modification is issued/processed by LADBS. A variance is handled by the Department of City Planning, when a project is not a by-right project.

    Read FAQ
Supplemental Plan Check List for Prestress Concrete (2014 LABC)
PC/STR/Corr.Lst.043-2014
       
What projections are allowed to the building’s footprint and height and still be considered as an Eligible Project?

Eaves: Project into the required side yard not more than 4 inches for each foot of width of such side yard, provided the width of the side yard is not reduced to less than 30 inches. Project into the required front and rear yards not more than 30 inches.

    Read FAQ
General Notes for Single-Family Dwelling
IB/P/GI 2020-022
       
Where can I find my sewer connection?

Please contact the Public Works Department.

    Read FAQ
Uncertified Fill Underground Structures
PC/GRAD/Aff4-2016
       
Guardrail Requirements Adjacent to Openable Windows
IB/P/BC 2023-105
Effective Date:
       
Does electrical equipment require approval by the City of Los Angeles Building and Safety Electrical Testing Laboratory (LADBS-ETL)?

    Read FAQ
2014 L.A. Amendment to CA Elevator Code
Ord. No.182846
       
How can I report an unpermitted grading/construction?

Online at our website or call 311.

    Read FAQ
What type of permit is required?

A permit is required for Demolition, New Building, Addition, and Alteration.

    Read FAQ
Residential Mandatory Measures for Additions and Alterations
PC/GRN/Corr.Lst.03-2026
Effective Date:
       
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.08-2016
       
How do I pay for an off-hour inspection?

Off-hour inspections can only be paid through the LADBS website.

    Read FAQ
Can I rebuild my attached or detached garage? Does it count as part of my 110%?

Yes you can rebuild your attached or detached garage as part of a like-for-like+10% project. Each detached structure will be evaluated individually for conformance with like-for-like requirements.

    Read FAQ
Los Angeles City Research Reports are allowed to be based on an Evaluation Report from a Nationally Recognized Model Code Agency. Who are Nationally Recognized Model Code Agencies currently accepted by LADBS Building Research Section?
    Read FAQ
Guidelines For Approval As Fabricator
IB/P/BC 2023-042
Effective Date:
       
YD Group - ADU75
    Read More  
Fire Pump Room Pre-Test Clearance and Report
IN/Form042-2016
       
DIRECTRICES PARA VERIFICACIÓN DE PLANOS Y REQUISITOS PARA EMISIÓN DE PERMISOS PARA SISTEMAS DE ENERGÍA SOLAR
IB/P/GI 2014-027 Guidelines for Plan Check and Permit Requirements for Solar Energy Devices