Skip to main content
Composite Steel Concrete Construction
IB/P/BC 2023-046
Effective Date:
       
When is a Reroof Certificate required?

A reroof certificate is required for existing building in which the roof is replaced or repaired.

    Read FAQ
Seismic Gas Shutoff Valve Inspection Request Form
IN/Form17-2016
       
What is a soft-story building?

A soft-story building is a structure which has a weaker first floor and is unable to carry the weight of the stories above during an earthquake.

    Read FAQ
Covenant and Agreement Regarding Easement
PC/STR/Aff18-2016
       
Title 24, California Code of Regulations - Accessibility Regulations Supplemental Correction List No. 4 (for 2011 Codes)
PC/DAD/Corr.Lst.4-2011
       
What do I need to attach to my refund?

You will need to attach your original cash register receipt and your application or permit copy containing the original cash register validation.

    Read FAQ
How can I obtain an application for product approval?

The application form can be found on the website here o

    Read FAQ
EBEWE_STATUS_ALL
       
ARCx Energy and Water Exemption Matrix
       
High Pressure Gas
PC/ALL/Mod33-2017
       
How is walking distance calculated per LAMC Section 12.22.A 33(c)(12)(i)(a)?

Walking distance is measured by the shortest distance that can be traveled by walking on public streets and sidewalks from a transit stop to the closest point on the subject Lot, as determined by  generally available mapping systems, such as Google Maps.

    Read FAQ
Dryer Moisture Duct
IN/Mod01-2016
       
Claim for Refund (with Instructions)
MISC/Form1-2016
       
How can an approval be renewed?
    Read FAQ
Can any testing agency listed or certify any electrical equipment to be used or installed in the City of Los Angeles?

No, the City of Los Angeles Municipal Code Section 93.0402 requires that the testing agencies and the product standards used by these agencies to be approved by the Department.

    Read FAQ
How can I get a copy of my plans (blueprints)?
    Read More  
Non-potable Rainwater Catchment System Correction Sheet
PC/MECH/Corr.Lst.109-2017
       
GREEN BUILDING CODE PLAN CHECK NOTES RESIDENTIAL BUILDINGS
GRN 14-2023
Effective Date:
       
When do I need a HVAC/Mechanical permit?

See the Los Angeles Municipal Code (L.A.M.C.), Section 95.112.1 for when a Mechanical permit is required.

    Read FAQ