When is a Reroof Certificate required?
A reroof certificate is required for existing building in which the roof is replaced or repaired.
What is a soft-story building?
A soft-story building is a structure which has a weaker first floor and is unable to carry the weight of the stories above during an earthquake.
What do I need to attach to my refund?
You will need to attach your original cash register receipt and your application or permit copy containing the original cash register validation.
How can I obtain an application for product approval?
The application form can be found on the website here o
How is walking distance calculated per LAMC Section 12.22.A 33(c)(12)(i)(a)?
Walking distance is measured by the shortest distance that can be traveled by walking on public streets and sidewalks from a transit stop to the closest point on the subject Lot, as determined by generally available mapping systems, such as Google Maps.
How can an approval be renewed?
Can any testing agency listed or certify any electrical equipment to be used or installed in the City of Los Angeles?
No, the City of Los Angeles Municipal Code Section 93.0402 requires that the testing agencies and the product standards used by these agencies to be approved by the Department.
How can I get a copy of my plans (blueprints)?
When do I need a HVAC/Mechanical permit?
See the Los Angeles Municipal Code (L.A.M.C.), Section 95.112.1 for when a Mechanical permit is required.