Skip to main content
What are the hours that I can work on my project?

Per the Los Angeles Zoning Code construction hours are 7:00 AM to 9:00 PM on weekdays, and 8:00 AM to 5:00 PM on Saturdays.

    Read FAQ
LADBS Employee Phone List
       
Green Building Code Correction Sheet for Newly Constructed Residential Buildings
PC/GRN/Corr.Lst.Res-New-2023
Effective Date:
       
What do I do once I comply with the Order To Comply?

Call the Inspector immediately to schedule an inspection to avoid any non-compliance fees.

    Read FAQ
When is an Architects & Engineer Certificate of Compliance required?

Projects that utilizes higher stresses require the Architect or Engineer to submit the form.

    Read FAQ
Can I have a special Event if there is no Certificate of Occupancy for the building?

No. To have a special event, the building must have a Certificate of Occupancy.

    Read FAQ
Inspection of Elevator Wiring
IB/P/EC 2017-004
       
Epoxy Injection of Cracks
PC/STR/Mod39-2020
       
REISSUED ARCX EXEMPTION CRITERIA UPDATE NOTICE-FINAL-040623
       
Complete Package Drafting - ADU58
    Read More  
What is the difference between Title 24, Part 6 energy regulation and regular plan check?

A Title 24, Part 6 plan check is only for California state energy regulation compliance of indoor or outdoor lighting, desegregation and monitoring of electrical loads, and distribution equipment or service(s).

    Read FAQ
Cover
    Read More  
Modal
    Read More  
Modal - ADU61
    Read More  
I have a Title 24 plan check completed. Didn't the fees for my permit get calculated already?

Generally speaking, no. A Title 24 plan check is typically only for plan check fees pertaining to energy compliance.

    Read FAQ
I have equipment that is listed by a recognized testing agency for a food display. Is it acceptable to install this in indoor location other than food display?

No. When equipment is identified or recognizable as suitable for a specific purpose, function, use, environment, application, or so forth either by its listing or by the code, the equipment must comply accordingly.

    Read FAQ
Instructions for Completing the Trade License Application
       
Preliminary Zoning Assessment Form
       
Green Building Code
    Read More  
Do I need any setbacks for my accessory building?

A recreation room and/or an Accessory Living Quarters are required to observe setbacks from the property line per Section 12.21.C.5 of L.A.M.C.

    Read FAQ