Skip to main content
Allowable Projection for Decks and Built-Up Platforms in Required Yards
IB/P/ZC 2023-004
Effective Date:
       
How long do I have to wait for a Demolition Pre-Inspection (DPI)?

A DPI normally takes two weeks minimum to be prepared.

    Read FAQ
Palisades Geohazard Risk Assessment Zones (PGRAZ)
       
First Office
    Read More  
Demolition Counter Plan Correction Sheet (2020 LABC)
PC/STR/Corr.Lst.110-2020
       
Methane Exemption for Single Family Dwellings with Raised Foundations
PC/STR/Mod057C-2020
       
Affidavit of Impact Hazard Glazing (for 2011 Codes)
PC/STR/Aff19-2009
       
Notice to Contractors Insurance and License Requirements
IB/P/GI 2026-001
Effective Date:
       
LADBS Services and Programs
       
Application for HVAC Permit or HVAC Plan Check
PC/MECH/App4-2019
       
Buildoly - ADU 84
    Read More  
LA City Code Amendments
    Read More  
Will I have to pay the CEIF fees?

Whenever an Order to Comply is issued you will be billed $336.00, plus a 6% surcharge fee.

    Read FAQ
Al Fresco Shade Sail Standard Plan
       
Who is the Architect on my neighbor's house?

The Architect information may be found on the Building Permit.

    Read FAQ
When do I need plans in order to pull a permit?

Any permit other than Express Permits or the online permits require plans. For the list of the Express Permits, check the corresponding Information Bulletin.

    Read FAQ
Supplemental Correction Sheet For Mass Timber (2023 LABC)
PC/STR/Corr.Lst.115-2023
       
Can I request an inspection for any permit & do I need to register beforehand?

You can request an inspection for any permit, regardless of whether it was obtained at an LADBS Development Services Center or on the Internet via 

    Read FAQ
Mandatory Requirements Checklist Newly-Constructed Non-Residential Buildings and Residential Buildings Over Six Stories (for 2011 Codes)
GRN 5-2013
       
Building Permit Checklist