Skip to main content
Sample Plan for S.F.D.
       
Is turning space (5' circle) required inside the bathroom of an individual dwelling unit?

Yes, per 1134A4.

    Read FAQ
OPERATIONS and MAINTENANCE MANUAL
GRN 6-2014
       
Building Permit Clearance Handbook
       
SERVICIOS DE CONSERJERÍA
Concierge Services Program Public Bulletin
       
Ordinance 185586
       
When do I need to file for a 3-day notification for excavation adjacent to a neighbor's property?

Please see Information Bulletin P/BC 2023-060 for a detailed explanation.

    Read FAQ
DROP-OFF transmittal cover sheet
       
How long will it take to get my report reviewed?

Regular: 5 to 6 weeks. Expedite: 4 to 5 weeks.

    Read FAQ
What are the requirements for a Elevator application?

 

Elevator Plan Check projects that qualify for ePlan must meet all of the following:

all

    Read FAQ
ADU Standard Plan Program
    Read More  
What is my property zone?

To find the zone for your property, please visit ZIMAS.

    Read FAQ
What do I do next?

Submit proof of previous retrofit, plans to retrofit, or plans to demolish to the Department of Building and Safety. Plans and calculations will be checked for compliance with the retrofit ordinance.

    Read FAQ
Old Permit Valuation Table January 2008
       
Does the Green code apply to my project?

Green Building code is applicable to the following projects:

  • New buildings
  • Additions of any size
  • Alter/Repair with a valuation of $200,000 or more
  • Alterations to residential buildings that result in increase in conditioned volume.
    Read FAQ
Are these plans open-source?

No. The participating architects and designers retain ownership of the designs.

    Read FAQ
Our Organization
    Read More  
United Dwelling
    Read More  
TIER 1 AND TIER 2 VOLUNTARY REQUIREMENTS CHECKLIST RESIDENTIAL BUILDINGS
GRN 4A-2015
       
Composite Steel Concrete Construction
IB/P/BC 2023-046
Effective Date: