File Haul Route Complaint
What is the "Hillside Grading Area"?
Lands identified to be located within a Hillside Area based on the latest BOE Basic Grid Map A-13372, per Section 91.7003 of the Building Code. This map is on file in the official City documents located in the Office of the City Clerk in the Council File No. 121222 Sup. #1.
Can I change my email address for my ePlanLA account?
No, you may not change your email. The email provided at registration serves as your account name.
Can I use testing conducted by our testing facility (in-house test lab)?
For General Approval – City of Los Angeles only:
How can I obtain Green Building approval?
Contact the designated plan checker on your project to make an appointment for verification of corrections. Contact information is provided on the correction sheet. Approval for Green Building requirements will be provided after verification of all corrections is completed.
Catherine Nuezca Gaba
- Oversees the following Building and Safety operations:
- One‐ and Two‐Unit Residential Complaint and Referral
- Commercial Complaint and Referral
- Vacant Building Abatement
- Pro‐active Code Enforcement
- Billboard and Sign Enforcement
- Environmental Affa
How much do I pay for a Permit extension?
The inspector assigned to your project can explain the required fees for a permit extension.
Residential Property Report
What is the difference between a Modification and a Variance?
A modification is issued/processed by LADBS. A variance is handled by the Department of City Planning, when a project is not a by-right project.