Skip to main content
How many wheelchair spaces are required in assembly areas?
In an assembly area, the number of required wheelchair-accessible spaces are determined based on the total fixed seat count provided for each functional area, per Table 11B-221.2.11.
    Read FAQ
Methane Hazard Mitigation Zone
PC/STR/Mod057B-2020
       
Documentation and Training Compliance Form
GRN 25-2026
       
Plan Check Correction Sheet for Untreated Gray Water (2023)
PC/MECH/Corr.Lst.116-2023
       
Guidelines for Permits and Inspections for Construction Projects that Require Grading Work
IB/P/BC 2026-128
Effective Date:
       
Boundary of the Adaptive Reuse Ordinance
       
Application for Pressure Vessel / Elevator Permit or Plan Check
PC/MECH/App06-2014
       
MANTENIMIENTO DE PLOMERÍA CERTIFICADO DE REGISTRO
IN/TL.013 Journey Level Plumber PLUMB Cert. of Regist
       
Do you accept payments by wire transfer?

Yes. Please contact ETL prior to the wire transfer.

Wire Routing Transit Number: (RTN/ABA) 121000248
International Transfer: International SWIFT BIC WFBIUS6S
Bank Name: Wells Fargo Bank, N.A.
Bank Address: 420 Montgomery Street, San Francisco, CA 94104

    Read FAQ
What is the Use?

Example of some uses are office, retail, restaurant, apartment, auto sales, auto repair, etc.

    Read FAQ
Temporary Sign Permit Cash Bond Form
PC/STR/Bond.001
       
LADWP - Electric Service Planning Information Form 2016
       
Water Conservation Ordinance Notes Residential Buildings
GRN18R-2020 Ord. No. 184248
Effective Date:
       
Counter Plan Check Correction Sheet (2020 LABC)
PC/STR/Corr.Lst.058-2020
       
What is the price per occupancy of the TCO?

For A, E, I, H, B, the fees are $98.00 per floor and R2 occ $189.00 per floor.

    Read FAQ
Are all plans for prefabricated or modular structures?

No. The ADU Standard Plan program includes pre-approved designs that are both meant to be built in place as well as designs that are prefabricated off-site.

    Read FAQ
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2026-007
Effective Date:
       
LAFD Requirement 96 Fire Department Reference - Requirements For Rooftop Photovoltaic (PV) Systems on One and Two Family Dwellings
       
Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2017 LARC)
PC/STR/Corr.Lst.020B-2017
       
When is a HVAC verification required?

When clearance for the HVAC is required to process the CofO.

    Read FAQ