Skip to main content
Commissioning Plan Compliance Form
GRN 23-2026
       
Supplemental Correction Sheet for Methane Mitigation Systems - Electrical (for 2011 Codes)
PC/ELEC/Corr.Lst.56-2011
       
Inspection Prior to Plan Check
PC/ALL/Mod27-20014
       
Siphonic Roof Drainage System
PC/ALL/Mod036-2017
       
Supplemental Correction Sheets for Cable Elevators (for 2011 Codes)
PC/MECH/Corr.Lst.27-2011
       
Covenant and Agreement Regarding Private Sewer Easement (Separate Owners for Each Parcel) (for 2011 Codes)
PC/STR/Aff34B-2008
       
Do I need approval from the Coastal Zone Committee to get a permit to rebuild my house?

Please inquire with the Department of City Planning for requirements and approvals relating to the Coastal Zone.

    Read FAQ
LADBS Go
    Read More  
Water Heater Temperature Relief Valve
IN/Mod09-2017
       
Can I install a stormwater infiltration system in a lot within a potentially liquefiable hazard zone?

In general, infiltration is not allowed within a potentially liquefiable hazard zone. However, sites within a potentially liquefiable zone can be considered for infiltration if a soils report demonstrates that the site is not subject to liquefaction.

    Read FAQ
Report Violation
    Read More  
Do I need to pay school fees and affordable housing linkage fees if I am building back a like-for-like Eligible Project? What if I am building back a project that is bigger than like-for-like?

Linkage Fee will not apply for the replacement of the existing house resulting in the net increase of 1500 sqft or less of floor area from the prior home that existed on the property. School District fees will not apply if the replacement house is built with the same square footage.

    Read FAQ
Graywater Standard Plan for Simple Residential System
       
How long do I have to wait for a Grading Pre-Inspection to be completed?

A Grading Pre-Inspection normally takes two weeks, but it could be longer.

    Read FAQ
How do I submit an application for an express permit?

You can apply for an express permit at 

    Read FAQ
FORMALDEHYDE EMISSIONS VERFICATION CHECKLIST
GRN 03-2026
       
What does the “Code Date” listed on the Los Angeles Research Report mean?

The Code Date stated on a Research Report (upper right corner on first page of Research Report) identifies which Los Angeles Building Code (LABC) edition the product specified in the research report is approved for. Building projects and LARR approved products shall have the same Code Date.

    Read FAQ
Do I need a permit to build a fence around my property?

A permit is not required for any type of fence under 3'6" in height.

A permit is required for a masonry or concrete fence over 3'6" in height, and for a fence of any other material over 10'0" in height. 

    Read FAQ
Plan Check Correction Sheet for Non-potable Rainwater Catchment System (2023)
PC/MECH/Corr.Lst.114-2023
       
Vacant
  • Oversees the following Building and Safety operations:
    • 1- and 2-Unit Residential Complaint and Referral
    • Commercial Complaint and Referral
    • Vacant Building Abatement
    • Pro-active Code Enforcement
    • Billboard and Signs Enforcement
    • Environmental Affairs
    Read FAQ