Skip to main content
Testing Req for Smoke Control Systems
IB/P/MC 2023-001
Effective Date:
       
Can I install a master PRV downstream of the fire pump in a sprinkler system?

A master PRV is allowed to be installed downstream of a fire pump when a second master PRV is installed to provide redundancy, so that failure of one PRV does not affect the operation of the fire protection system.

    Read FAQ
What are the requirements for a HVAC application?

 

    Read FAQ
Inspection Construction Map Bird Streets - Laurel Canyon Map
       
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
       
How can an approval be renewed?

Only products that have either a Laboratory or General Approval (no one-time approvals) may be subject to annual renewal. About 60 days before an approval expires, the original applicant needs to take the following actions:

    Read FAQ
EBEWE Compliance Instructions 2021
       
Accessibility Details for Parking
IB/P/BC 2026-084
Effective Date:
       
YOU-ADU Example Title Page
       
Why can't I obtain copies of my Plumbing and Electrical plans?

Building and Safety does not maintain copies of Plumbing or Electrical plans.

    Read FAQ
Is there a resource for contractor-related information and guidance?

The contractor state licensing board can provide contractor-related information. Their website can be found here: CSLB 
 

    Read FAQ
Can I rebuild my house to the same size and configuration I had prior to the fire?

The Governor's Executive Order and Mayor's Revised Emergency Executive Order #1 authorize that primary and accessory structures can be rebuilt that are in substantially the same location as, and do not exceed 110% of the footprint and height of, the primary and accessory structures that existed i

    Read FAQ
February 2025 Newsletter
       
Permit and Inspection Homeowners Guide for Single Family and ADUs
       
Dwellings in High Wind Velocity Areas (HWA)
IB/P/BC 2023-016
Effective Date:
       
LADBS and LAFD Streamlined Plan Check Process
       
Definition of "Commenced Construction" and Similar Phrases
IB/P/GI 2020-016
       
Plan Review & Permitting
    Read More  
Supplemental Correction Sheets for Pump Systems (Domestic or Fire) (2017 LAPC & 2016 NFPA-20)
PC/MECH/Corr.Lst.30-2017
       
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2026-117
Effective Date: