Mechanical HVAC Inspection
Provides inspection services for all commercial and industrial buildings, and verifies compliance with the Mechanical code.
About Inspection
LADBS is responsible for inspections of all Heating, Ventilation, Air Conditioning, Refrigeration and Fire Life Safety Testing for Mechanical systems, including stairwell pressurization and smoke control smoke evacuation systems installed in all commercial, mixed use and multifamily buildings.
Additional Resources
- Code Amendment
- Forms & Applications
- Request for Modification
Filtered categories:
6 Inch Concrete Block Masonry Wall Detail
IB/P/BC 2026-096
- Effective
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2026-098
- Effective
Certificates of Completion Versus Certificates of Occupancy for Condominium Conversions and Other Alterations to Apartment Buildings
IB/P/BC 2026-108
- Effective
Plan Check Guidelines for State Approved Factory-Built Housing (FBH)
IB/P/BC 2026-112
- Effective
Contents of Reports for Submittal to the LADBS Grading Division
IB/P/BC 2026-113
- Effective
Filtered categories:
Mandatory Requirements Checklist Newly Constructed Residential Buildings
GRN 04-2026
Mandatory Requirements Checklist: Newly Constructed Residential Buildings
GRN 4-2017
MANDATORY REQUIREMENTS CHECKLIST NEWLY CONSTRUCTED RESIDENTIAL BUILDINGS
GRN 4-2020
- Effective
MANDATORY REQUIREMENTS CHECKLIST NEWLY CONSTRUCTED RESIDENTIAL BUILDINGS
GRN 4-2014
MANDATORY REQUIREMENTS CHECKLIST NEWLY CONSTRUCTED RESIDENTIAL BUILDINGS
GRN 4-2014
MANDATORY REQUIREMENTS CHECKLIST NEWLY CONSTRUCTED RESIDENTIAL BUILDINGS
GRN 4-2015
MANDATORY REQUIREMENTS CHECKLIST NEWLY CONSTRUCTED RESIDENTIAL BUILDINGS
GRN 4-2016
MANDATORY REQUIREMENTS CHECKLIST NEWLY CONSTRUCTED RESIDENTIAL BUILDINGS
GRN 4-2014
Mandatory Requirements Checklist Newly-Constructed Residential Buildings of Six Stories or Less (for 2011 Codes)
GRN 4-2013
Mandatory Wood Frame Soft-Story Retrofit Plan Review List-Chapter 93 (2026 LABC)
PC/STR/Corr.Lst.114-2026
- Effective