Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
Do the inspectors work weekends for special events?
Yes, staff work days include Saturday and Sunday.
Do you accept electrical equipment with the "CE" logo?
No. "CE" is not recognized by the City of Los Angeles. It is a designation used for the self-certified equipment in Europe.
Do you accept payments by wire transfer?
Yes. Please contact ETL prior to the wire transfer.
Wire Routing Transit Number: (RTN/ABA) 121000248
International Transfer: International SWIFT BIC WFBIUS6S
Bank Name: Wells Fargo Bank, N.A.
Bank Address: 420 Montgomery Street, San Francisco, CA 94104
Account Number: 2000045258718
Please include Wells Fargo USD $8.00 charge for all incoming wire transfers.
For additional information regarding wire transfers, please contact Precy Sanchez at (213) 482-6955.
Do you review methane reports?
No. Methane reports are reviewed by the building plan checker. See Chapter 71 of the LABC.
How are changes to approved plans during construction handled by the department?
Generally speaking, any changes to Department-approved plans shall be approved by the plan review engineer who reviewed and issued the permit.
Sometimes, the changes can be handled over the counter on the same day it is brought in; other times, the changes may need to be resubmitted for further review with an additional plan review fee. In either case, it is always a good idea to first call the plan review engineer who issued the permit and ask for his/her help.
How are the fees calculated for a TCO?
The fees are calculated by the type of occupancy.
How are the fees for plan check calculated?
Fees for plan check are calculated based on items to be reviewed and permitted. You can find the breakdown of these item in sections 93.0214 through 93.0224.
How can I check the status of my submitted plans?
The plan check status can be obtained from the LADBS website or by going to Plan Review.
How can I find out if my project is a by right project?
You can check the zoning of your property by visiting ZIMAS. Visit one of LADBS Zoning counters for more information.
How can I find out if my property is in a seismic hazard zone?
Check the Parcel Profile Report available on the Department’s website. NavigateLA also shows the extent of seismic hazard zones colored in the map.
Filtered categories:
Filtered categories: