Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
If a portion of a single family dwelling is converted into a JADU, do I need a separate address for the JADU?
Public Works - Bureau of Engineering will determine if the JADU requires a new address.
I have a technical change I want to include to my Los Angeles City Research Report and I also need to renew my current Research Report. What are the fees and what forms do I need to fill out?
Two forms must be completed together:
- Application for New General Approval or Technical Modification (PC-STR.App18)
- Application for Renewal and Clerical Modification of General Approval (PC-STR.App19)
- Each form shall be processed separately with each its respective fee, specified on each application. One check may be made for the total or separate checks may be sent with each application..
Is Homeowner Association (HOA) approval required?
If your property is part of a Homeowners Association (HOA), your property may be subject to Covenants, Conditions, and Restrictions (CC&Rs)—private agreements that may impose development standards or conditions different from those in the current Los Angeles Zoning Code. LADBS does not review or enforce CC&Rs, and the issuance of a permit does not indicate compliance with them.
Applicants are advised to contact their HOA prior to submitting plans to LADBS. Many HOAs may require plan review before submission to the City, which can save you from going through the permitting process for a project the HOA might ultimately reject.
Is there a resource for contractor-related information and guidance?
The contractor state licensing board can provide contractor-related information. Their website can be found here: CSLB
Los Angeles City Research Reports are allowed to be based on an Evaluation Report from a Nationally Recognized Model Code Agency. Who are Nationally Recognized Model Code Agencies currently accepted by LADBS Building Research Section?
Section III of Alternate Building Materials Products Approval Requirements specifies the qualifications that Nationally Recognized Model Code Agency must meet for their Evaluation Report to be used as a basis for a Los Angeles City Research Report.
Currently, Evaluation Reports from the International Code Council Evaluation Services (ICC-ES) and, the International Association of Plumbing and Mechanical Officials Uniform Evaluation Service (IAPMO UES) may be used as a basis for a Los Angeles City Research Report.
Once a standard plan is selected, how does a customer indicate the use of the standard plan on the LADBS permit application?
When submitting your Building Permit application, please indicate the Standard Plan number you are using in the work description. For example, SFH000, ADU00, or MISC000.
Once a standard plan is selected, how does a customer indicate the use of the standard plan on the LADBS permit application?
When submitting your Building Permit application, please indicate the SFD Standard Plan number you are using in the work description.
Once a standard plan is selected, how does a customer indicate the use of the standard plan on the LADBS permit application?
When submitting your Building Permit application, please indicate the ADU Standard Plan number you are using in the work description.
Are Geology and Soils reports required?
Geology and Soils reports are required in some geologically sensitive areas as outlined in the Information Bulletin P/BC 2025-157 Geologic and Geotechnical Considerations for Rebuilding in the Palisades Fire Area.
Are surveys required?
Yes, surveys are required if the property lines are not clear or cannot be established in the field.
Filtered categories:
Filtered categories: