Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
A Certificate of Occupancy is required for new buildings, additions, change of use or occupancy.
Was this helpful?
Commissioning report is required for all new non-residential projects of 10,000 square feet or more. The exceptions are warehouses, open parking garages and similar projects.
Was this helpful?
When the customer decides not to use anti graffiti coating on the first 9 feet of the exterior of the building.
Was this helpful?
When required by the engineer or indicated on the approved plans.
Was this helpful?
When there are higher stresses in the structural design.
Was this helpful?
When all wallboard has been installed and nailed or screwed in.
Was this helpful?
When clearance for the electrical is required to process the Certificate of Occupancy.
Was this helpful?
When the building is a title 19, A or E occupancy.
Was this helpful?
When clearance for the fire sprinkler is required to process the Certificate of Occupancy.
Was this helpful?
When all forms and rebar (reinforcing bar) are in place, but before concrete is placed.
Was this helpful?
Filtered categories:
Filtered categories: