Electrical Test Lab (ETL)
The ETL evaluates electrical equipment for safety, fire and shock hazards and personnel injuries in accordance with the current applicable codes and standards. Approved materials are published as Los Angeles Research Reports (LARR).
Contact the
ETL
Electrical Testing Laboratory
Address: 221 N. Figueroa St. Room 500, Los Angeles, CA 90012
Telephone: (213) 482-6721 Fax: (213) 482-6554
Engineer: Antonio Maldonado
Email: antonio.maldonado@lacity.org Telephone: (213) 482-7382
Engineer: Isaac Almaraz
Email: isaac.almaraz@lacity.org Telephone: (213) 482-0035
Engineer: Stephanie Lopez
Email: stephanie.j.lopez@lacity.org Telephone: (213) 482-0068
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- FAQ
- Forms & Applications
- Publication & Rosters
FAQ Search Results
Filtered categories:
All
Generally speaking, no. A Title 24 plan check is typically only for plan check fees pertaining to energy compliance. Permit fees are only pre-calculated when the plan check also includes the power system, or when the applicant knows what he/she wants to obtain on a permit at time of plan check approval stage and plans to obtain the permit at that time.
Was this helpful?
No. When equipment is identified or recognizable as suitable for a specific purpose, function, use, environment, application, or so forth either by its listing or by the code, the equipment must comply accordingly. In this case, the equipment could only be used as part of a food display and its use for any other purpose would void its listing or may be in violation of code.
Was this helpful?
You will need to review the corrections and provide responses to each corrections and revise your plans accordingly. Once you are ready, you can call your plan checker to schedule a meeting (called "Verification") to go over the corrections.
Was this helpful?
There is no set time and it changes based on our workload. You can ask staff who are processing your plan submittal to give you an idea on the number of the working days it will take to assign your plans. This waiting time is called backlog. Our goal is to reduce the backlog days for every project.
Was this helpful?
Yes, but only when the area of the open window and the distance from the window to the furthest location in the room comply with the requirements of Title 24.
Was this helpful?
The inspector will issue to the correction for you to return to plan check and correct the error.
Was this helpful?
Yes, if it complies with the definition of a carriage unit per LABC 202.
Was this helpful?
Guest rooms in a hotel for sleeping purposes and any related use is considered a residential project.
Was this helpful?
Yes, a lift is required at public swimming pools.
Was this helpful?
An accessible route must be provided to connect each story and mezzanine in a multi-story building (see exceptions per 11B-206.2.3).
Was this helpful?