Permits for simple projects, which do not require plan check, are readily issued as Express Permits or e-permits when done online.
All contractors must complete a subcontractor form providing information on any subcontractors used on the project. This form must be returned to the Office of Finance
Filtered categories:
In general, four years, unless there is a change in the scope of work or adoption of a new LABC.
Was this helpful?
The general and laboratory approval is good for 12 months. The product approval letter indicates the duration and expiration date of the approved product.
One-time approval is good for the duration where the equipment is installed, provided that the equipment is not modified or relocated to another location in or outside of the building or facility.
Was this helpful?
A General Approval/Laboratory Approval is valid for one year from the approval date.
Was this helpful?
The process time depends on the current backlog and type of application submitted. Contact the Mechanical Test Lab Engineer for more information. You may find test lab contact information on our Mechanical Test Lab page.
Was this helpful?
The amount time needed to check a plan will vary week to week based on the day's backlog at the time of submittal. You may ask any available staff about the current backlog and a time estimate.
Was this helpful?
Regular: 5 to 6 weeks. Expedite: 4 to 5 weeks.
Was this helpful?
5% minimum is required.
Was this helpful?
2% of the dwelling units. If parking is assigned, then 2% of the assigned parking spaces must be accessible. If unassigned, then a minimum of 5% of parking spaces must be accessible.
Was this helpful?
DA parking stalls must be provided in accordance with Table 11B-208.3.
Was this helpful?
Minimum 5% of the seating spaces for dining surfaces must be accessible and dispersed within other types of seating located in the functional area.
Was this helpful?