Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Correction Sheet for Electrical Fire Pump System (for 2011 Codes)
PC/ELEC/Corr.Lst.24-2009
Supplemental Correction Sheet for Energy Conservation
PC/STR/Corr.Lst.102-2020
Supplemental Correction Sheet for Energy Conservation (for 2011 Codes)
PC/STR/Corr.Lst.102-2011
Supplemental Correction Sheet for Flexible Diaphragm (for 2011 Codes)
PC/STR/Corr.Lst.38-2010
Supplemental Correction Sheet for LA Residential Code Prescriptive Design (for 2011 Codes)
PC/STR/Corr.Lst.20B-2011
Supplemental Correction Sheet for Mansionization Ordinance (for 2011 Codes)
PC/STR/Corr.Lst.106-2011
Supplemental Correction Sheet For Mass Timber (2023 LABC)
PC/STR/Corr.Lst.115-2023
Supplemental Correction Sheet for Methane Mitigation Systems (Electrical)
PC/ELEC/Corr.Lst.56-2017
Supplemental Correction Sheet for Methane Mitigation Systems - Electrical (for 2011 Codes)
PC/ELEC/Corr.Lst.56-2011
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017