Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheet for Methane Mitigation Systems - Mechanical (for 2011 Codes)
PC/MECH/Corr57-2011
Supplemental Correction Sheet for Prestress Concrete (for 2011 Codes)
PC/STR/Corr.Lst.43-2010
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.111-2014
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.08-2016
Supplemental Correction Sheet for Solar Photovoltaic Systems (for 2011 Codes)
PC/ELEC/Corr.Lst.111-2009
Supplemental Correction Sheet for Steel Frame Design (for 2011 Codes)
PC/STR/Corr.Lst.44-2010
Supplemental Correction Sheet for Steel Moment Frame Design (for 2011 Codes)
PC/STR/Corr.Lst.52-2010
Supplemental Correction Sheet for Stormwater SUSMP & SSMP (for 2011 Codes)
PC/STR/Corr.Lst.101-2010
Supplemental Correction Sheet for Swimming Pools (for 2011 Codes)
PC/STR/Corr.Lst.108-2010