Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Correction Sheets for Cable Elevators (for 2026 Codes)
CL-MC-2026-003
- Effective
Supplemental Correction Sheet for Type I And Ii Kitchen Systems Type (2026 LAMC)
CL-MC-2026-004
- Effective
Plan Check Correction Sheet for Plumbing Systems
CL-PC-2026-001
- Effective
Plan Check Correction Sheet for Sewage Ejectors and Sump Pumps
CL-PC-2026-002
- Effective
Plan Check Correction Sheet for Methane Mitigation Systems
CL-PC-2026-003
- Effective
Plan Check Correction Sheet for Untreated Gray Water Systems
CL-PC-2026-004
- Effective
Plan Check Correction Sheet for On-Site Treated Non-Potable Gray Water Systems
CL-PC-2026-005
- Effective
Plan Check Correction Sheet for Non-Potable Rainwater Catchment System
CL-PC-2026-006
- Effective
Plan Check Correction Sheet for Non-Potable Water Reuse (Recycled) Systems
CL-PC-2026-007
- Effective
Plan Check Correction Sheet for NFPA 13 Installation of Sprinkler Systems (2025 Edition)
CL-PC-2026-008
- Effective