Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Plan Check Correction Sheet for NFPA 13R Installation of Sprinkler In Low-Rise Residential Occupancies (2025 Edition)
CL-PC-2026-010
- Effective
Plan Check Correction Sheet for NFPA 14 Installation of Standpipe Systems (2024 Edition)
CL-PC-2026-011
- Effective
Plan Check Correction Sheet for NFPA 20 Installation of Fire Pump Systems (2025 Edition)
CL-PC-2026-012
- Effective
Plan Check Correction Sheet for NFPA 22 Water Tanks for Fire Protection (2023 Edition)
CL-PC-2026-013
- Effective
Plan Check Correction Sheet for NFPA 13 (2025 Edition) Fire Sprinkler Systems for Automated Mechanical Parking Lifts (Car Stackers)
CL-PC-2026-014
- Effective
Single Family Dwelling/Duplex Plan Check Correction Sheets (2026 LARC)
CL-RC-2026-001
- Effective
Single Family Dwelling/Duplex Plan Check Correction Sheets (2026 LARC)
CL-RC-2026-001
- Effective
Fire Hazard Severity Zone Supplemental Checklist 2025 California Wildland-Urban Interface Code (CWUIC) & CCR Title 14 Fire Safe Regulations
CL-WC-2026-001
- Effective