Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Procedures for Hazardous or Contaminated Materials Found during Geological Exploration
IB/P/BC 2026-131
- Effective
Soils/Geology Report Reqs when Filing Parcel Map with City Planning
IB/P/BC 2026-132
- Effective
Minimum Info to be Shown on Grading Plans
IB/P/BC 2026-133
- Effective
GUIDELINES AND APPLICATION FOR SUBMITTING HAUL ROUTES WITH IMPORT OR EXPORT AMOUNTS GREATER THAN 1,000 CUBIC YARDS
IB/P/BC 2026-134
- Effective
SS Program - Permitting and Inspection Process Guidelines
IB/P/BC 2026-136
- Effective
SS Program - Structural Design Guidelines
IB/P/BC 2026-137
- Effective
Guidelines for Determining Live Loads Surcharge from Sidewalk Pedestrian Traffic and Street Traffic
IB/P/BC 2026-141
- Effective
Guidelines for Permitting New Antennas and Replacement of Units on Existing Telecommunication Antennas (Cell Towers)
IB/P/BC 2026-146
- Effective
Procedures for the Application of ASCE 41-22 to Existing Buildings
IB/P/BC 2026-148
- Effective