Skip to main content
California Lead Free Law Requirements
       
Newly Constructed Non-Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.02-2026
Effective Date:
       
Safety Test - Cabled Elevators Installed Prior to October 25, 1998 One and Five Year (Group II)
IN/EPV/Form01-2016
       
Is a permit required to install a domestic cooking range, broiler unit, or domestic-type clothes dryer in my single-family dwelling unit?

No.

    Read FAQ
Acknowledgement of Deferred Collection of Plan Check and Permit Fees per the Mayor's Emergency Executive Order No. 7
       
Plastic Underground Piping Variance
PC/ALL/Mod101-2017
       
Can I use these plans to add an ADU as an addition to my home?

No, these pre-approved ADU Standard Plans are only for new, detached structures.

    Read FAQ
Supplemental Correction Sheet for the Baseline Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 01/01/2023)
PC/STR/Corr.Lst.107A
       
When is an Energy Certificate required?

When work performed and materials used are required to comply with Title 24 Energy Regulations.

    Read FAQ
Garage Drains
IB/P/PC 2026-011
Effective Date:
       
Supplemental Plan Check List for Prestress Concrete (2023 LABC)
PC/STR/Corr.Lst.043-2023
       
What are the steps of the ePlanLA application process?

The steps of an ePlanLA application are:

1. Submit Application for Screening 
2. Application Review 
3. Plan Check 
4. Corrections Issued 
5. Plan Check Complete 
6. Permit Issued
 

    Read FAQ
Accessibility Details for Restrooms and Drinking Fountains
IB/P/BC 2026-087
Effective Date:
       
May an ADU be created on a Lot that is a substandard Lot (for instance, due to an illegal Lot split in the past)?

State law allows a local ADU ordinance to establish certain ADU development standards. However, these standards shall not include minimum lot size (see GC Section  65852.2(a)(1)(B)(i)).

    Read FAQ
Is my rebuild project required to have rooftop solar panels?

Under the Governor's Executive Order N-29-25 issued on July 7, 2025, solar pv systems are not required.

    Read FAQ
Solar PV Microinverter Standard Plan - Simplified (2020 LAEC)
       
Benchmarking 2023
    Read More  
Maintenance of Approved Building Plans
IB/P/BC 2026-063
Effective Date:
       
Lytemods - ADU46
    Read More  
The Foothill Catalog Foundation
    Read More