Skip to main content
Determination of the Zoning Height of a Building or Structure
IB/P/ZC 2023-008
       
Grading Inspections
    Read More  
Tom Marble Architecture (TMA)
    Read More  
When is an Air Quality Management District (AQMD) clearance letter required?

An AQMD clearance letter is required whenever there is a "Yes" answer to any of the questions on the AQMD "Air Quality Permit Checklist". The AQMD clearance letter will be required before a Certificate of Occupancy is issued. For more information, please call 1-800-CUT-SMOG.

    Read FAQ
How many units will be required to comply with DA?

For elevator buildings, all units on floors served by the elevator must be accessible. For non-elevator buildings, all ground floor units must be accessible.

    Read FAQ
Eligibility Checklist for Expedited Solar Photovoltaic Permitting for Residential
       
Early Start Permit (Foundation Only)
PC/STR/Mod052-2020
       
How many of the DA parking stalls need to be van stalls?

1 in 6 DA parking stalls required by Table 11B-208.3 must be a van stall.

    Read FAQ
NFPA 13R 2022 - Plan Check Correction Sheet
PC/MECH/NFPA13R-2022
       
Are these plans available free?

No. Each pre-approved plan is available for a fee determined by the architect or designer in consultation with the homeowner/client. Please see the link, ‘For further information on this standard plan click here.’ listed under each plan.

    Read FAQ